Tender pricing · Cost engineering · Saudi Arabia and GCC

Your tender project, priced in 48 hours

Upload your tender package. Our quantity surveyors and procurement engineers return your tender project priced: every material line with a low, mid and high rate band in SAR and a verification grade, with division subtotals and a project total.

No payment now. You pay only after you see your result.

Excel, PDF, Word, DWG, ZIP or RAR. Any format, handled under strict confidentiality.

  • Your priced tender project within 48 hours of a complete tender package
  • No rate released below our 90% verification threshold
  • Fee refunded on any line a registered supplier beats
Pricing schedule Electrical Works
Specimen · Rate band, SAR
Item Description Unit Qty Low Mid High Grade
1.01 4C × 240 mm² Cu/XLPE/SWA/PVC cable, 0.6/1 kV m 1,250 420.00 455.00 495.00 97%
1.02 Main distribution board 2500 A, Form 4b No. 2 165,000 182,000 198,000 94%
1.03 HDG cable tray 300 × 50 mm, with cover m 860 58.00 66.00 75.00 96%
1.04 LED recessed panel 600 × 600, 40 W No. 1,480 78.00 92.00 110.00 93%
1.05 Sandwich busway 1600 A, copper, IP55 m 120 2,650 2,900 3,180 91%
5 of 5 lines above the 90% threshold
Division subtotal (mid) SAR 1,473,670
Specimen showing the layout of the deliverable. Live rates are built for your project from our market price records and live market verification at the time of pricing.
  • 65K+suppliers in our network
  • 1.1M+requests for quotation issued to suppliers
  • 3.7M+building products catalogued
  • 20K+registered partners
  • KSA + GCCcoverage across Saudi Arabia and the GCC
Deliverables

Your tender project priced, line by line

The tender package you send us comes back as a complete pricing schedule, built by our cost engineers and verified against the live market.

Every material line priced

Each item returns with a unit rate and an extended amount in SAR, matched to the specification, brand grade and quantity in your tender documents.

Low, mid and high rate band

Three market-verified rates per line show where the market sits, so you set your bid level knowingly instead of relying on a single figure.

Verification grade on every rate

Each rate carries a grade showing how strongly it is supported by our market price records and live market verification. Nothing below 90% is released.

Division subtotals and project total

Rates roll up into division subtotals and a project total, ready for your cost plan and bid summary.

Live market verification

Rates are built from our market price records and verified live in the market by our procurement engineers before release.

Private tracking page

A reference number and a private link show each stage of the work, the delivery countdown, and your downloads once the pricing schedule is released.

Scope of the rates

Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up, added by your team on top of our rates.

How it works

From tender package to priced tender project in four steps

A controlled workflow run by our engineering team, from the first document to the final rate.

  1. Submit your tender package

    Upload the drawings, specifications and bill of quantities in any format and tick the divisions you need priced. You receive a reference number immediately.

  2. Document control and item breakdown

    Our quantity surveyors register every document, read the bill of quantities against the drawings and specifications, and break it down into priceable material lines.

  3. Rate build-up and live market verification

    Our cost engineers build each rate from our market price records, and our procurement engineers verify live in the market any line below the 90% threshold.

  4. See your result, then pay and download

    Within 48 hours of a complete package your tender project is priced. Your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online and download the full pricing schedule.

Our guarantees

Three guarantees, written into every job

Tender pricing only has value if you can rely on it. These are the terms we work to.

48 hours

48-hour delivery

Your priced tender project within 48 hours of receiving a complete tender package.

90% verification threshold

90% verification threshold

Every rate carries a verification grade. No rate is released below 90%.

14 days to claim

Price-match refund

A registered supplier quotes below our rate band within 14 days? We refund the pricing fee for that line.

Read the full guarantee terms
  1. 48-hour delivery

    Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.

  2. 90% verification threshold

    Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.

  3. Price-match refund

    If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.

Packages

Choose the scope you need priced

Three packages, by the number of divisions in your tender project.

The fee is paid after the result. When your tender project is priced you see a preview on your tracking page, then pay online to download the full pricing schedule.

One division

One trade package

Pricing fee SAR 70

  • Pricing schedule for one division
  • Rate band and verification grade on every line
  • Division subtotal
  • All three guarantees apply
Select this package

Three divisions

Up to three trade packages

Pricing fee SAR 150

  • Pricing schedules for up to three divisions
  • Rate band and verification grade on every line
  • Division subtotals and combined total
  • All three guarantees apply
Select this package

Full project

All divisions in the tender

Pricing fee SAR 200

  • Pricing schedule for every division in the tender
  • Rate band and verification grade on every line
  • Division subtotals and project total
  • All three guarantees apply
Select this package
Who it is for

Built for the teams that carry the bid

Main contractors

Price full tenders against the clock and go into bid submission with market-verified material rates across every division.

MEP and fit-out subcontractors

Price your trade package precisely, with rate bands that show how far you can sharpen your offer.

Developers

Check contractor offers against market-verified rates and build your cost plan on market-verified numbers.

Consultants

Support tender evaluation and value engineering with a pricing schedule referenced to current market rates.

Questions

Tender project pricing: questions and answers

Is tender project pricing the same as BOQ pricing?

Yes. Tender project pricing is what the market also calls BOQ pricing: putting a market rate against every line of the bill of quantities in your tender documents. You send us the tender package; our quantity surveyors and procurement engineers return your tender project priced, with a low, mid and high rate band for each material line, a verification grade, division subtotals and a project total.

What do I need to upload?

Upload the full tender package: the drawings, specifications, bill of quantities and any addenda. Excel, PDF, Word, DWG, ZIP and RAR files are all accepted, and you can drop a whole folder at once. The more complete the package, the sooner the scope is confirmed and the 48-hour clock starts.

How does the 48-hour delivery guarantee work?

Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.

What is the 90% verification threshold?

Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.

How does the price-match refund work?

If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.

Do the rates include installation and labour?

No. Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up.

What is a rate band?

Each line carries three rates in SAR: low, mid and high. The band shows the range the market is quoting for that specification, brand grade and quantity, so you can choose your bid level on each line.

How much does tender project pricing cost?

One division is SAR 70. Up to three divisions are SAR 150. The full project, with all its divisions, is SAR 200. You pay only after you see your result.

When do I pay?

Only after you see your result. Submitting your request and uploading the tender package cost nothing. When your tender project is priced, your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online to download the full pricing schedule.

Are my tender documents kept confidential?

Yes. Tender documents are handled under strict confidentiality and used only to price your scope.

Which regions do you cover?

We price tenders for projects across Saudi Arabia and the GCC, with rates built for delivery in your project city.

What happens if my tender package is incomplete?

Our quantity surveyors tell you exactly what is missing. The 48-hour clock starts when all documents are received and the scope is confirmed.

Tender closing soon? Send the package today.

Submit your tender package now and receive your priced tender project within 48 hours of a complete package.

Submitting and uploading cost nothing. You pay only after you see your result.

Your tender documents are handled under strict confidentiality and used only to price your scope.

Our Clients