48-hour delivery
Your priced tender project within 48 hours of receiving a complete tender package.
Send the ELV package of your tender. Our cost engineers price every material line, from structured cabling and network switches to CCTV, access control and public address, with a rate band and a verification grade.
No payment now. You pay only after you see your result.
Excel, PDF, Word, DWG, ZIP or RAR. Any format, handled under strict confidentiality.
| Item | Description | Unit | Qty | Low | Mid | High | Grade |
|---|---|---|---|---|---|---|---|
| 7.01 | Cat6A U/FTP cable, LSZH | m | 48,000 | 3.40 | 3.90 | 4.50 | 97% |
| 7.02 | IP dome camera, 4 MP | No. | 186 | 520.00 | 610.00 | 700.00 | 94% |
| 7.03 | Server rack 42U, 800 × 1000 mm | No. | 6 | 3,800 | 4,300 | 4,900 | 96% |
| 7.04 | Access control door set: controller and reader | No. | 64 | 1,650 | 1,880 | 2,100 | 92% |
| 7.05 | Access switch, 24-port PoE+ | No. | 22 | 4,200 | 4,750 | 5,300 | 93% |
ELV systems are priced by part number and system brand. We price each line to the system brand and performance named in the specification.
The tender package you send us comes back as a complete pricing schedule, built by our cost engineers and verified against the live market.
Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up, added by your team on top of our rates.
A controlled workflow run by our engineering team, from the first document to the final rate.
Upload the drawings, specifications and bill of quantities in any format and tick the divisions you need priced. You receive a reference number immediately.
Our quantity surveyors register every document, read the bill of quantities against the drawings and specifications, and break it down into priceable material lines.
Our cost engineers build each rate from our market price records, and our procurement engineers verify live in the market any line below the 90% threshold.
Within 48 hours of a complete package your tender project is priced. Your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online and download the full pricing schedule.
Tender pricing only has value if you can rely on it. These are the terms we work to.
Your priced tender project within 48 hours of receiving a complete tender package.
Every rate carries a verification grade. No rate is released below 90%.
A registered supplier quotes below our rate band within 14 days? We refund the pricing fee for that line.
Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.
Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.
If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.
Three packages, by the number of divisions in your tender project.
The fee is paid after the result. When your tender project is priced you see a preview on your tracking page, then pay online to download the full pricing schedule.
One trade package
Pricing fee SAR 70
Up to three trade packages
Pricing fee SAR 150
All divisions in the tender
Pricing fee SAR 200
System schematics, device layout drawings, equipment schedules, the ELV bill of quantities and the ELV specification.
Yes. Where the tender documents name a part number, the line is priced to that part. Where they give a performance requirement only, we price to the specified system brand grade.
No. Fire alarm is priced with fire fighting under Fire Fighting & Fire Alarm. Add that division if your tender includes it.
Licences listed as tender items are priced as supply items. Programming, configuration and commissioning are not material supply and stay in your own build-up.
Submit your tender package now and receive your priced tender project within 48 hours of a complete package.
Submitting and uploading cost nothing. You pay only after you see your result.
Your tender documents are handled under strict confidentiality and used only to price your scope.
YouMats
Typically replies within an hour
Please Scan QR code