Tender project pricing · Plumbing & Drainage

Plumbing & drainage tender pricing

Send the plumbing package of your tender. Our quantity surveyors price every material line, from water supply and drainage pipework to sanitary ware, pumps and water heaters, with a rate band and a verification grade.

No payment now. You pay only after you see your result.

Excel, PDF, Word, DWG, ZIP or RAR. Any format, handled under strict confidentiality.

Pricing schedule Plumbing & Drainage
Specimen · Rate band, SAR
Item Description Unit Qty Low Mid High Grade
3.01 PPR pipe PN20, 32 mm m 3,400 6.80 7.60 8.50 98%
3.02 uPVC drainage pipe, 110 mm m 2,100 14.50 16.20 18.00 97%
3.03 Wall-hung WC with concealed cistern No. 96 1,150 1,320 1,500 93%
3.04 Electric water heater, 80 L No. 48 520.00 590.00 660.00 96%
3.05 Booster pump set, duty and standby, 10 L/s Set 1 38,000 42,500 47,000 91%
5 of 5 lines above the 90% threshold
Division subtotal (mid) SAR 257,400
Specimen showing the layout of the deliverable. Live rates are built for your project from our market price records and live market verification at the time of pricing.
  • 65K+suppliers in our network
  • 1.1M+requests for quotation issued to suppliers
  • 3.7M+building products catalogued
  • 20K+registered partners
  • KSA + GCCcoverage across Saudi Arabia and the GCC
What we price

Plumbing & Drainage tender items we price

Plumbing packages are long: hundreds of pipe and fitting sizes, each a small line that adds up. We price them all, by material, pressure rating and size.

  • PPR, CPVC and PEX water supply pipes and fittings
  • Copper pipes and fittings
  • uPVC and HDPE drainage pipes and fittings
  • Valves, strainers and pressure reducing valves
  • Sanitary ware: WCs, basins, sinks and urinals
  • Mixers, taps and accessories
  • Electric and central water heaters
  • Booster, transfer and submersible pumps
  • GRP and polyethylene water tanks
  • Floor drains, cleanouts and gullies
  • Manhole covers and frames
  • Pipe insulation, hangers and supports
Deliverables

What you receive

The tender package you send us comes back as a complete pricing schedule, built by our cost engineers and verified against the live market.

  • Pipes and fittings priced by material, pressure rating and diameter
  • Sanitary ware and mixers priced by the model or brand grade in the schedule
  • Pump sets priced against flow, head and configuration
  • Division subtotal for the plumbing package, ready for your bid summary

Scope of the rates

Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up, added by your team on top of our rates.

How it works

From tender package to priced tender project in four steps

A controlled workflow run by our engineering team, from the first document to the final rate.

  1. Submit your tender package

    Upload the drawings, specifications and bill of quantities in any format and tick the divisions you need priced. You receive a reference number immediately.

  2. Document control and item breakdown

    Our quantity surveyors register every document, read the bill of quantities against the drawings and specifications, and break it down into priceable material lines.

  3. Rate build-up and live market verification

    Our cost engineers build each rate from our market price records, and our procurement engineers verify live in the market any line below the 90% threshold.

  4. See your result, then pay and download

    Within 48 hours of a complete package your tender project is priced. Your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online and download the full pricing schedule.

Our guarantees

Three guarantees, written into every job

Tender pricing only has value if you can rely on it. These are the terms we work to.

48 hours

48-hour delivery

Your priced tender project within 48 hours of receiving a complete tender package.

90% verification threshold

90% verification threshold

Every rate carries a verification grade. No rate is released below 90%.

14 days to claim

Price-match refund

A registered supplier quotes below our rate band within 14 days? We refund the pricing fee for that line.

Read the full guarantee terms
  1. 48-hour delivery

    Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.

  2. 90% verification threshold

    Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.

  3. Price-match refund

    If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.

Packages

Choose the scope you need priced

Three packages, by the number of divisions in your tender project.

The fee is paid after the result. When your tender project is priced you see a preview on your tracking page, then pay online to download the full pricing schedule.

One division

One trade package

Pricing fee SAR 70

  • Pricing schedule for one division
  • Rate band and verification grade on every line
  • Division subtotal
  • All three guarantees apply
Select this package

Three divisions

Up to three trade packages

Pricing fee SAR 150

  • Pricing schedules for up to three divisions
  • Rate band and verification grade on every line
  • Division subtotals and combined total
  • All three guarantees apply
Select this package

Full project

All divisions in the tender

Pricing fee SAR 200

  • Pricing schedule for every division in the tender
  • Rate band and verification grade on every line
  • Division subtotals and project total
  • All three guarantees apply
Select this package
Questions

Plumbing & Drainage tender pricing: questions and answers

Which documents should I upload for the plumbing package?

Water supply and drainage drawings, the sanitary ware schedule, pump schedules, the plumbing bill of quantities and the plumbing specification.

Do you price every fitting, or only the pipework?

Every line in the tender is priced. Where fittings are listed as separate lines we price them one by one; where they are carried as a percentage on the pipe, the rate follows the same method.

How do you price sanitary ware specified as "or approved equal"?

The rate band is built for the brand grade named in the specification. If you want an alternative brand grade priced, name it in the notes.

Are external drainage networks covered here?

Drainage inside the building is priced under Plumbing & Drainage. Site-wide sewer and stormwater networks are priced under Infrastructure & External Works.

Tender closing soon? Send the package today.

Submit your tender package now and receive your priced tender project within 48 hours of a complete package.

Submitting and uploading cost nothing. You pay only after you see your result.

Your tender documents are handled under strict confidentiality and used only to price your scope.

Our Clients