Item Description Unit Qty Low Mid High Grade
5.01 Ready-mix concrete C40, sulphate-resisting cement m³ 3,800 255.00 272.00 290.00 98%
5.02 Reinforcing steel bars, Grade 60 ton 520 2,450 2,580 2,720 97%
5.03 Hollow concrete block, 200 mm No. 86,000 2.60 2.90 3.20 96%
5.04 Torch-applied waterproofing membrane, 4 mm m² 5,200 17.00 19.50 22.00 94%
5.05 Structural steel sections, S275 ton 85 3,900 4,250 4,600 92%
5 of 5 lines above the 90% threshold
Division subtotal (mid) SAR 3,087,250
Specimen showing the layout of the deliverable. Live rates are built for your project from our market price records and live market verification at the time of pricing.
  • 65K+suppliers in our network
  • 1.1M+requests for quotation issued to suppliers
  • 3.7M+building products catalogued
  • 20K+registered partners
  • KSA + GCCcoverage across Saudi Arabia and the GCC
What we price

Civil & Structural tender items we price

Civil works carry the largest quantities in a tender, so a small movement in a unit rate moves the whole bid. We price bulk materials for delivery to your project city.

  • Ready-mix concrete by grade and cement type
  • Reinforcing steel bars and welded mesh
  • Formwork materials and accessories
  • Concrete blocks: hollow, solid and insulated
  • Cement, sand and aggregates
  • Precast concrete elements and hollow-core slabs
  • Structural steel sections and plates
  • Waterproofing membranes and coatings
  • Thermal insulation boards
  • Concrete admixtures, curing and repair products
  • Expansion joints and water stops
  • Backfill and sub-base materials
  • Anchor bolts and embedded items
Deliverables

What you receive

The tender package you send us comes back as a complete pricing schedule, built by our cost engineers and verified against the live market.

  • Concrete priced by grade, cement type and delivery to your project city
  • Reinforcing steel priced per ton by grade and diameter range
  • Waterproofing and insulation priced by system and thickness
  • Division subtotal for the civil package, ready for your bid summary

Scope of the rates

Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up, added by your team on top of our rates.

How it works

From tender package to priced tender project in four steps

A controlled workflow run by our engineering team, from the first document to the final rate.

  1. Submit your tender package

    Upload the drawings, specifications and bill of quantities in any format and tick the divisions you need priced. You receive a reference number immediately.

  2. Document control and item breakdown

    Our quantity surveyors register every document, read the bill of quantities against the drawings and specifications, and break it down into priceable material lines.

  3. Rate build-up and live market verification

    Our cost engineers build each rate from our market price records, and our procurement engineers verify live in the market any line below the 90% threshold.

  4. See your result, then pay and download

    Within 48 hours of a complete package your tender project is priced. Your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online and download the full pricing schedule.

Our guarantees

Three guarantees, written into every job

Tender pricing only has value if you can rely on it. These are the terms we work to.

48 hours

48-hour delivery

Your priced tender project within 48 hours of receiving a complete tender package.

90% verification threshold

90% verification threshold

Every rate carries a verification grade. No rate is released below 90%.

14 days to claim

Price-match refund

A registered supplier quotes below our rate band within 14 days? We refund the pricing fee for that line.

Read the full guarantee terms
  1. 48-hour delivery

    Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.

  2. 90% verification threshold

    Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.

  3. Price-match refund

    If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.

Packages

Choose the scope you need priced

Three packages, by the number of divisions in your tender project.

The fee is paid after the result. When your tender project is priced you see a preview on your tracking page, then pay online to download the full pricing schedule.

One division

One trade package

Pricing fee SAR 70

  • Pricing schedule for one division
  • Rate band and verification grade on every line
  • Division subtotal
  • All three guarantees apply
Select this package

Three divisions

Up to three trade packages

Pricing fee SAR 150

  • Pricing schedules for up to three divisions
  • Rate band and verification grade on every line
  • Division subtotals and combined total
  • All three guarantees apply
Select this package

Full project

All divisions in the tender

Pricing fee SAR 200

  • Pricing schedule for every division in the tender
  • Rate band and verification grade on every line
  • Division subtotals and project total
  • All three guarantees apply
Select this package
Questions

Civil & Structural tender pricing: questions and answers

Which documents should I upload for the civil package?

Structural drawings and general notes, the civil and structural bill of quantities, the concrete and steel specifications, and the soil report if the tender documents refer to it.

Are concrete rates specific to my project city?

Yes. Ready-mix concrete is a local supply, so rates are built for delivery in your project city. Enter the city in the request form.

How do you treat steel price movement?

Reinforcing steel is priced from current market prices at the time of pricing. The rate band shows the spread the market is quoting on that date.

Can you price structural steel from the drawings?

We price from the quantities in your tender documents. Where structural steel is given as a tonnage, the rate is built per ton for the specified grade and section types.

Tender closing soon? Send the package today.

Submit your tender package now and receive your priced tender project within 48 hours of a complete package.

Submitting and uploading cost nothing. You pay only after you see your result.

Your tender documents are handled under strict confidentiality and used only to price your scope.

Our Clients