Tender project pricing · Mechanical & HVAC

Mechanical & HVAC tender pricing

Send the mechanical package of your tender. Our cost engineers price every equipment and material line, from chillers and air handling units to ductwork, piping and insulation, with a rate band and a verification grade.

No payment now. You pay only after you see your result.

Excel, PDF, Word, DWG, ZIP or RAR. Any format, handled under strict confidentiality.

Pricing schedule Mechanical & HVAC
Specimen · Rate band, SAR
Item Description Unit Qty Low Mid High Grade
2.01 Air-cooled screw chiller, 300 TR No. 2 520,000 565,000 610,000 92%
2.02 Air handling unit, 10,000 CFM, double skin No. 6 68,000 76,500 84,000 94%
2.03 Galvanised steel ductwork, 0.8 mm m² 4,200 62.00 70.00 79.00 97%
2.04 Fan coil unit, 800 CFM, concealed No. 140 1,450 1,620 1,800 95%
2.05 Black steel pipe Sch 40, 6 in, chilled water m 620 185.00 205.00 228.00 96%
5 of 5 lines above the 90% threshold
Division subtotal (mid) SAR 2,236,900
Specimen showing the layout of the deliverable. Live rates are built for your project from our market price records and live market verification at the time of pricing.
  • 65K+suppliers in our network
  • 1.1M+requests for quotation issued to suppliers
  • 3.7M+building products catalogued
  • 20K+registered partners
  • KSA + GCCcoverage across Saudi Arabia and the GCC
What we price

Mechanical & HVAC tender items we price

HVAC packages are equipment-led: a few lines carry most of the value. Our procurement engineers verify those lines live in the market, and the high-volume materials are priced against current market rates.

  • Air-cooled and water-cooled chillers
  • Air handling units and fresh air handling units
  • Fan coil units
  • Package units, split units and VRF systems
  • Galvanised steel ductwork and accessories
  • Duct and pipe insulation
  • Chilled water pipes and fittings
  • Valves: isolation, balancing and control
  • Chilled water and condenser water pumps
  • Ventilation and smoke extract fans
  • Grilles, diffusers and dampers
  • Cooling towers
  • Controls and BMS field devices
Deliverables

What you receive

The tender package you send us comes back as a complete pricing schedule, built by our cost engineers and verified against the live market.

  • Equipment priced against the schedules: capacity, duty, efficiency and specified brand grade
  • Ductwork priced by sheet gauge and area from the tender quantities
  • Pipes, fittings and valves priced by material, schedule and size
  • Division subtotal for the mechanical package, ready for your bid summary

Scope of the rates

Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up, added by your team on top of our rates.

How it works

From tender package to priced tender project in four steps

A controlled workflow run by our engineering team, from the first document to the final rate.

  1. Submit your tender package

    Upload the drawings, specifications and bill of quantities in any format and tick the divisions you need priced. You receive a reference number immediately.

  2. Document control and item breakdown

    Our quantity surveyors register every document, read the bill of quantities against the drawings and specifications, and break it down into priceable material lines.

  3. Rate build-up and live market verification

    Our cost engineers build each rate from our market price records, and our procurement engineers verify live in the market any line below the 90% threshold.

  4. See your result, then pay and download

    Within 48 hours of a complete package your tender project is priced. Your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online and download the full pricing schedule.

Our guarantees

Three guarantees, written into every job

Tender pricing only has value if you can rely on it. These are the terms we work to.

48 hours

48-hour delivery

Your priced tender project within 48 hours of receiving a complete tender package.

90% verification threshold

90% verification threshold

Every rate carries a verification grade. No rate is released below 90%.

14 days to claim

Price-match refund

A registered supplier quotes below our rate band within 14 days? We refund the pricing fee for that line.

Read the full guarantee terms
  1. 48-hour delivery

    Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.

  2. 90% verification threshold

    Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.

  3. Price-match refund

    If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.

Packages

Choose the scope you need priced

Three packages, by the number of divisions in your tender project.

The fee is paid after the result. When your tender project is priced you see a preview on your tracking page, then pay online to download the full pricing schedule.

One division

One trade package

Pricing fee SAR 70

  • Pricing schedule for one division
  • Rate band and verification grade on every line
  • Division subtotal
  • All three guarantees apply
Select this package

Three divisions

Up to three trade packages

Pricing fee SAR 150

  • Pricing schedules for up to three divisions
  • Rate band and verification grade on every line
  • Division subtotals and combined total
  • All three guarantees apply
Select this package

Full project

All divisions in the tender

Pricing fee SAR 200

  • Pricing schedule for every division in the tender
  • Rate band and verification grade on every line
  • Division subtotals and project total
  • All three guarantees apply
Select this package
Questions

Mechanical & HVAC tender pricing: questions and answers

Which documents should I upload for the HVAC package?

Equipment schedules, HVAC layout and schematic drawings, the mechanical bill of quantities and the mechanical specification with the approved vendor list.

How do you price major equipment such as chillers and AHUs?

Major equipment is priced against the equipment schedule: capacity, duty conditions and the specified brand grade. Lines that do not reach the 90% verification threshold from our market price records are verified live in the market by our procurement engineers before release.

Do you price ductwork by weight or by area?

We follow the unit in your tender documents. Whether the ductwork is measured by area or by weight, the rate is built for that unit and for the specified sheet gauge.

Can you price one mechanical system only?

Yes. Choose Mechanical & HVAC as your division and describe the system in the notes, for example chilled water only. It is priced as one division.

Tender closing soon? Send the package today.

Submit your tender package now and receive your priced tender project within 48 hours of a complete package.

Submitting and uploading cost nothing. You pay only after you see your result.

Your tender documents are handled under strict confidentiality and used only to price your scope.

Our Clients