Tender project pricing · Architectural Finishes

Architectural finishes tender pricing

Send the finishes package of your tender. Our cost engineers price every material line, from floor and wall tiles to gypsum partitions, paint systems, doors and cladding, with a rate band and a verification grade.

No payment now. You pay only after you see your result.

Excel, PDF, Word, DWG, ZIP or RAR. Any format, handled under strict confidentiality.

Pricing schedule Architectural Finishes
Specimen · Rate band, SAR
Item Description Unit Qty Low Mid High Grade
6.01 Porcelain floor tile, 600 × 600 mm m² 6,400 38.00 46.00 55.00 95%
6.02 Gypsum board partition, 12.5 mm on steel studs m² 4,800 24.00 27.50 31.00 97%
6.03 Interior emulsion paint, three-coat system m² 22,000 4.20 4.90 5.60 96%
6.04 Fire-rated wooden door with frame, 60 min No. 210 1,450 1,680 1,900 92%
6.05 Aluminium composite cladding panel, 4 mm PVDF m² 1,900 68.00 78.00 90.00 93%
5 of 5 lines above the 90% threshold
Division subtotal (mid) SAR 1,035,200
Specimen showing the layout of the deliverable. Live rates are built for your project from our market price records and live market verification at the time of pricing.
  • 65K+suppliers in our network
  • 1.1M+requests for quotation issued to suppliers
  • 3.7M+building products catalogued
  • 20K+registered partners
  • KSA + GCCcoverage across Saudi Arabia and the GCC
What we price

Architectural Finishes tender items we price

Finishes are where specifications and brand grades vary most, and where the rate band matters most. We price each line to the finish schedule.

  • Porcelain, ceramic and natural stone tiles
  • Marble and granite
  • Gypsum board partitions and ceilings
  • Suspended ceiling tiles and grid systems
  • Paints, primers and coatings
  • Wooden, steel and fire-rated doors
  • Ironmongery and door hardware
  • Aluminium windows, doors and curtain walling
  • Glass and glazing
  • Cladding panels and facade systems
  • Raised access flooring
  • Vinyl, carpet and epoxy flooring
  • Tile adhesives, grouts and screeds
Deliverables

What you receive

The tender package you send us comes back as a complete pricing schedule, built by our cost engineers and verified against the live market.

  • Rates matched to the finish schedule: material, size, thickness and brand grade
  • Doors priced by type from the door schedule, with ironmongery sets
  • Paint priced as a complete system: primer, undercoat and finish coats
  • Division subtotal for the finishes package, ready for your bid summary

Scope of the rates

Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up, added by your team on top of our rates.

How it works

From tender package to priced tender project in four steps

A controlled workflow run by our engineering team, from the first document to the final rate.

  1. Submit your tender package

    Upload the drawings, specifications and bill of quantities in any format and tick the divisions you need priced. You receive a reference number immediately.

  2. Document control and item breakdown

    Our quantity surveyors register every document, read the bill of quantities against the drawings and specifications, and break it down into priceable material lines.

  3. Rate build-up and live market verification

    Our cost engineers build each rate from our market price records, and our procurement engineers verify live in the market any line below the 90% threshold.

  4. See your result, then pay and download

    Within 48 hours of a complete package your tender project is priced. Your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online and download the full pricing schedule.

Our guarantees

Three guarantees, written into every job

Tender pricing only has value if you can rely on it. These are the terms we work to.

48 hours

48-hour delivery

Your priced tender project within 48 hours of receiving a complete tender package.

90% verification threshold

90% verification threshold

Every rate carries a verification grade. No rate is released below 90%.

14 days to claim

Price-match refund

A registered supplier quotes below our rate band within 14 days? We refund the pricing fee for that line.

Read the full guarantee terms
  1. 48-hour delivery

    Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.

  2. 90% verification threshold

    Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.

  3. Price-match refund

    If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.

Packages

Choose the scope you need priced

Three packages, by the number of divisions in your tender project.

The fee is paid after the result. When your tender project is priced you see a preview on your tracking page, then pay online to download the full pricing schedule.

One division

One trade package

Pricing fee SAR 70

  • Pricing schedule for one division
  • Rate band and verification grade on every line
  • Division subtotal
  • All three guarantees apply
Select this package

Three divisions

Up to three trade packages

Pricing fee SAR 150

  • Pricing schedules for up to three divisions
  • Rate band and verification grade on every line
  • Division subtotals and combined total
  • All three guarantees apply
Select this package

Full project

All divisions in the tender

Pricing fee SAR 200

  • Pricing schedule for every division in the tender
  • Rate band and verification grade on every line
  • Division subtotals and project total
  • All three guarantees apply
Select this package
Questions

Architectural Finishes tender pricing: questions and answers

Which documents should I upload for the finishes package?

The finish schedule, door and window schedules, reflected ceiling plans, the architectural bill of quantities and the architectural specification.

How do you price items specified by a named product?

Named products are priced as specified. Where the specification allows an approved equal, the rate band reflects the brand grade named, and you can ask for an alternative brand grade in the notes.

Do you price fit-out packages for retail and offices?

Yes. Fit-out tenders are priced under Architectural Finishes, and MEP lines in the same tender can be added as further divisions.

How are paint lines measured in square metres priced?

The rate is built for the unit in your tender documents. For paint measured by area, we convert the specified system and coverage into a material supply rate per square metre.

Tender closing soon? Send the package today.

Submit your tender package now and receive your priced tender project within 48 hours of a complete package.

Submitting and uploading cost nothing. You pay only after you see your result.

Your tender documents are handled under strict confidentiality and used only to price your scope.

Our Clients