Tender project pricing · Infrastructure & External Works

Infrastructure & external works tender pricing

Send the infrastructure package of your tender. Our quantity surveyors price every material line, from water, sewer and stormwater pipe networks to manholes, asphalt, kerbs and paving, with a rate band and a verification grade.

No payment now. You pay only after you see your result.

Excel, PDF, Word, DWG, ZIP or RAR. Any format, handled under strict confidentiality.

Pricing schedule Infrastructure & External Works
Specimen · Rate band, SAR
Item Description Unit Qty Low Mid High Grade
8.01 HDPE pipe PE100 PN16, 315 mm m 2,400 215.00 238.00 262.00 96%
8.02 Precast concrete manhole, 1200 mm, with cover No. 58 4,600 5,150 5,700 93%
8.03 Asphalt wearing course ton 3,200 215.00 232.00 250.00 97%
8.04 Precast kerbstone, 150 × 300 mm m 7,500 16.00 18.00 20.50 98%
8.05 Interlocking paver, 80 mm m² 9,800 34.00 38.00 43.00 96%
5 of 5 lines above the 90% threshold
Division subtotal (mid) SAR 2,119,700
Specimen showing the layout of the deliverable. Live rates are built for your project from our market price records and live market verification at the time of pricing.
  • 65K+suppliers in our network
  • 1.1M+requests for quotation issued to suppliers
  • 3.7M+building products catalogued
  • 20K+registered partners
  • KSA + GCCcoverage across Saudi Arabia and the GCC
What we price

Infrastructure & External Works tender items we price

Infrastructure tenders run on long quantities and heavy materials, where delivery to site is a real part of the rate. We price for delivery to your project city.

  • HDPE, GRP, uPVC and ductile iron pipes and fittings
  • Precast concrete manholes, chambers and covers
  • Valves, hydrants and network fittings
  • Asphalt: base, binder and wearing courses
  • Aggregate base and sub-base materials
  • Kerbstones and interlocking pavers
  • Street lighting poles and luminaires
  • Underground cable ducts and warning tape
  • Geotextiles and geomembranes
  • Irrigation pipes, valves and emitters
  • Road marking, signage and traffic barriers
  • Fencing and gates
  • Precast box culverts and drainage channels
Deliverables

What you receive

The tender package you send us comes back as a complete pricing schedule, built by our cost engineers and verified against the live market.

  • Pipes priced by material, pressure class, stiffness and diameter
  • Asphalt and aggregates priced for delivery to your project city
  • Manholes and chambers priced by size, depth and cover load class
  • Division subtotal for the infrastructure package, ready for your bid summary

Scope of the rates

Rates are for material supply delivered to site. Installation, labour and contractor overheads are the bidder's own build-up, added by your team on top of our rates.

How it works

From tender package to priced tender project in four steps

A controlled workflow run by our engineering team, from the first document to the final rate.

  1. Submit your tender package

    Upload the drawings, specifications and bill of quantities in any format and tick the divisions you need priced. You receive a reference number immediately.

  2. Document control and item breakdown

    Our quantity surveyors register every document, read the bill of quantities against the drawings and specifications, and break it down into priceable material lines.

  3. Rate build-up and live market verification

    Our cost engineers build each rate from our market price records, and our procurement engineers verify live in the market any line below the 90% threshold.

  4. See your result, then pay and download

    Within 48 hours of a complete package your tender project is priced. Your tracking page shows a preview of the result: the number of lines priced and sample lines. You then pay the fee online and download the full pricing schedule.

Our guarantees

Three guarantees, written into every job

Tender pricing only has value if you can rely on it. These are the terms we work to.

48 hours

48-hour delivery

Your priced tender project within 48 hours of receiving a complete tender package.

90% verification threshold

90% verification threshold

Every rate carries a verification grade. No rate is released below 90%.

14 days to claim

Price-match refund

A registered supplier quotes below our rate band within 14 days? We refund the pricing fee for that line.

Read the full guarantee terms
  1. 48-hour delivery

    Your priced tender project is delivered within 48 hours of receiving a complete tender package. The clock starts when all documents are received and the scope is confirmed. Very large multi-division packages receive a confirmed delivery date before work starts.

  2. 90% verification threshold

    Every rate carries a verification grade, and no rate is released below our 90% verification threshold. Lines that do not reach it are verified live in the market by our procurement engineers before release.

  3. Price-match refund

    If, within 14 days of delivery, you obtain a written quotation from a registered supplier below the lower bound of our rate band for the same specification, brand grade and quantity, delivered to the same city and on the same VAT basis, we refund the pricing fee for that line. Send us the quotation to claim.

Packages

Choose the scope you need priced

Three packages, by the number of divisions in your tender project.

The fee is paid after the result. When your tender project is priced you see a preview on your tracking page, then pay online to download the full pricing schedule.

One division

One trade package

Pricing fee SAR 70

  • Pricing schedule for one division
  • Rate band and verification grade on every line
  • Division subtotal
  • All three guarantees apply
Select this package

Three divisions

Up to three trade packages

Pricing fee SAR 150

  • Pricing schedules for up to three divisions
  • Rate band and verification grade on every line
  • Division subtotals and combined total
  • All three guarantees apply
Select this package

Full project

All divisions in the tender

Pricing fee SAR 200

  • Pricing schedule for every division in the tender
  • Rate band and verification grade on every line
  • Division subtotals and project total
  • All three guarantees apply
Select this package
Questions

Infrastructure & External Works tender pricing: questions and answers

Which documents should I upload for the infrastructure package?

Network plans and profiles, standard detail drawings, the road pavement design, the infrastructure bill of quantities and the specification.

Do rates allow for delivery to remote sites?

Rates are built for delivery to the project city you enter. If the site is remote from the nearest city, describe the location in the notes so the delivery basis is confirmed with your scope.

Can you price a single network, such as stormwater only?

Yes. Choose Infrastructure & External Works and describe the network in the notes. It is priced as one division.

Do you price to authority standards?

Lines are priced to the standards and approvals named in your specification, including the requirements of the relevant utility or municipality where the specification states them.

Tender closing soon? Send the package today.

Submit your tender package now and receive your priced tender project within 48 hours of a complete package.

Submitting and uploading cost nothing. You pay only after you see your result.

Your tender documents are handled under strict confidentiality and used only to price your scope.

Our Clients