A galvanized scaffolding pipe, manufactured by JAECO, made of high-quality carbon steel and hot-dip galvanized to ensure corrosion and rust resistance. It is characterized by its high durability and resistance to weather conditions, making it an ideal choice for scaffolding projects in outdoor or humid environments such as construction sites, bridges, and industrial projects. This pipe provides excellent load-bearing capacity while maintaining a manageable weight and is used as a fundamental component in scaffolding systems to ensure structural stability and worker safety. Available in various sizes to suit all projects.
- Wall Thickness: 3 mm
- Nominal Outer Diameter: 48.3 mm
- Sectional Area: 427 mm²
- Moment of Inertia: 0.1099 × 10⁶ mm⁴
- Section Modulus: 4551 mm³
- Radius of Gyration: 16.04 mm
- Minimum Yield Stress: 235 N/mm² (34 ksi)
- Standard: BS 1139
- Product Code: BS1139
Additional Information▼
Scaffolding Pipe (JAECO) — Key Details for Saudi Site Use
This scaffolding pipe from JAECO is a hot-dip galvanized carbon-steel tube designed for reliable performance on construction sites where moisture, dust, and outdoor exposure are common. The galvanized finish helps reduce surface corrosion and supports longer service life when the tube is stored, transported, and maintained correctly.
Quick Specification Summary
- Brand: JAECO
- Finish: Galvanized
- Wall thickness: 3 mm
- Outer diameter: 48.3 mm
- Standard: BS 1139
- SKU: YT-02118842
How to Select the Right Scaffolding Pipe
- Confirm compatibility: Use with fittings/couplers intended for 48.3 mm tube systems to ensure proper grip and stability.
- Choose by application: For general access scaffolds, select pipes that match your system design and load plan; the 3 mm wall thickness is a common choice where durability is required.
- Check compliance: Specify BS 1139 when your project documentation requires it for scaffolding components.
Handling & Basic Safety Notes
- Inspect each scaffolding pipe for dents, deep corrosion, cracks, or deformation before use and remove damaged tubes from service.
- Store off the ground and keep bundles secured to limit impact damage and reduce moisture trapping.
- Installation and loading should follow the project’s approved scaffolding method statement and competent supervision to protect workers and the structure.